The consultant is to study State Road (SR) 173 also known as Blue Angel Parkway, From State Road 292 (Sorrento Road) to U.S. Highway 98 (Lillian Highway). The project is approximately three (3) miles in length. The project will study the expansion of the existing two-lane roadway to a four-lane divided roadway.
![]()

The consultant is to study State Road (SR) 292 also known as Sorrento Road, from the south end of the Theo Baars Bridge to SR 173 (Blue Angel Parkway). The project is approximately six (6) miles in length. The project will study the expansion of the existing two-lane roadway to a four-lane divided roadway and the addition of a two-lane bridge to provide a four-lane capacity for the Theo Baars Bridge.
![]()

The consultant is to study State Road (SR) 292, also known as Perdido Key Drive, from the Alabama State Line to the south end of the Theo Baars Bridge. The project is approximately seven (7) miles in length, and goes from the Alabama State Line to the intersection of Innerarity Point Road and Gulf Beach Highway. The project will study the expansion of the existing two-lane roadway to a four-lane divided roadway.


The consultant is to study the proposed corridor known as Pinestead-Longleaf Corridor from Pine forest Road to U.S. Highway 29. The project is approximately three (3) miles in length. The project will study the proposed corridor that begins at the existing west end of Longleaf Drive at Pine Forest Road and would extend in a northeasterly direction to connect the Pinestead Road. The project ends at U.S. Highway 29.
![]()